Input Parameters

Results

--
Study Level
--
Estimated Study Cost
$
--
Max Export Capacity
kW
--
Upgrade Risk
Note: FERC Small Generator Interconnection Procedures (SGIP) define study levels. Fast track applies to most residential systems. Commercial systems over 25 kW require engineering studies.

Reference

Export Capacity = System Size - Existing Load Study Level based on system size and export: <25 kW: Level 1 (Fast Track) <2 MW, export<50%: Level 2 (Supplemental) <5 MW: Level 3 (System Impact) >5 MW: Level 4 (Facilities Study) Costs scale with system size and study level