Reference
Export Capacity = System Size - Existing Load
Study Level based on system size and export:
<25 kW: Level 1 (Fast Track)
<2 MW, export<50%: Level 2 (Supplemental)
<5 MW: Level 3 (System Impact)
>5 MW: Level 4 (Facilities Study)
Costs scale with system size and study level